If you needed to update their IDs to reflect the phase each line item belongs to through an alphanumeric ID, you’d do the following:Ī) Highlight all activities occurring during phase 1 of the project, as shown in Figure 3.1 below.ī) Right-click, choose “Renumber Activity IDs” and check the “Auto-number” option.Ĭ) Pick a prefix such as “PH1-”, a suffix “1000” and an increment value of 10. You will then be prompted to i) define an increment value, ii) define prefix/suffix, or iii) replace characters in the current numbering structure of the selected activities.įor example, let’s assume you have a group of activities belonging to 2 different phases of your project and whose IDs are entirely numeric. In order to renumber multiple activities, all you need to do is highlight the line items whose IDs you need to update, right-click and select “Renumber Activity IDs”. 3 RENUMBER ACTIVITY IDSĪlthough P6 is more flexible than P3 when it comes to changing activity IDs, making edits for multiple activities can be cumbersome-especially if you’re dealing with, say, more than 10 activities or even worse: renumbering an entire schedule. Once you access this tab, you’ll be able to select pre-determined values for all the parameters mentioned above. If the Defaults tab is not visible, make sure you right-click anywhere in the Project Details area, choose “Customize Project Details” from the drop-down menu and move Defaults to the Displayed Tabs list on the right. In order to do this, go to the Projects window, select the project you’re working on, and then locate the Defaults tab at the bottom of the screen, where the Project Details are displayed.

primavera p3 sdef problem opening calendar file run stopped

In other words, there is a way you can pre-assign a given value to each of these settings for all new activities you insert into the schedule, eliminating the need to edit them on a per-activity basis after you’ve added the new tasks. The Defaults tab under project settings can save you a lot of time if you need to add multiple activities with the same calendar, duration type, percent complete type, activity type, cost account, and/or even a given ID structure. 2 PROJECT-LEVEL SETTINGS: USING THE DEFAULTS TAB

PRIMAVERA P3 SDEF PROBLEM OPENING CALENDAR FILE RUN STOPPED SOFTWARE

This check can be performed manually within P6 by looking at relationship lines on the Gantt chart or looking at predecessors/ successors in the Activity Details window, or through the Schedule Check utility available in Primavera Risk Analysis, or other schedule analysis software with similar capabilities. Note that open ends are also generated by activities whose i) only predecessor relationship is a finish-to-finish link or ii) only successor relationship is a start-to-start link. Learn what construction technology leaders say about 4D BIM?